- This event has passed.
Long Bridge Drive to S. Hayes Street Design Meeting
January 26, 2022 @ 7:00 pm - 9:00 pm
public meeting, January 26, 7 pm; Jan. 24-Feb. 13 Online Engagement. The proposed design for Phase 1, along northern Crystal Drive and Eastern 12th St., part of the much larger Transitway Extension Project from Potomac Yards to Pentagon City [https://bit.ly/arl-pc-transitway].
Connect
Connect with us on the following social media platforms.